Gemadept transported successfully 16 units E-103 EP2 WECs in the Mui Dinh wind farm
2018 October, Gemadept transported successfully 16 units E-103 EP2 WECs in the Mui Dinh wind farm - Ninh Thuan - Viet Nam. The wind energy converters will be installed on tubular steel towers at a hub height of 85 metres.
Vietnam is one of the countries in South East Asia with a growing demand for energy. This is down to the rapid economic growth, which in turn is leading to an increase in prosperity. “Renewable energies are a quick way to cover part of this energy demand”, says Steffen Brauns. That is why attention is turning to the renewables in Vietnam, where the aim is to develop wind energy resources in the next years.
Cargo included:
- 48 Rotor blade L49.6m x W4.2m x H2.9m - weight 11 tons.
- Hubs, Generators, Towers, ...
Scope of work:
- Discharging , steverdore cargoes on heavy vessel at Cam Ranh port.
- Receive cargo from heavy vessel directly at Cam Ranh port, transport to port yard, unloading.
- Lift on / lift off , transport cargoes from port yard to Mui Dinh wind farm, discharging.